Bridges ready to install on Tamihi connector

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Bridges ready to install on Tamihi connector

    Alright DualsportBC, MOFLNRO has come through on the next step of the Tamihi work. The two new bridges are being delivered tomorrow to the campground for staging.

    We will be looking for volunteers to help transport and install decking, date TBD but very shortly.

    During talks this spring the club indicated we would assist in trying to secure 2x6 PT decking and fasteners, if you have any leads please message me. Details on required quantities and lengths will be available shortly. Due to the short notice from MOFLNRO we are under pressure on this as when they complete the bridges sturcture installation that main trail will not be rideable until we deck them.

    Details will be added as they are known to us.
    What do you know for sure?

  • #2
    Wow. I'm a little out of touch on the plan. Are these bridges for the new connector path to get over to the other side instead of using the low road?

    Comment


    • #3
      Yes that is correct LordEndo
      What do you know for sure?

      Comment


      • #4
        Materials we are looking for donation or discount....
        -2x6 PT 8' @ 112 pics. (Or 90 @ 10' or 75 @ 12')
        - Self taping screws with large washer style head 3" ~ has to go through 2x6 and 3mm of aluminum.~400pcs
        What do you know for sure?

        Comment