I could not resit to post that. I'm dreaming of a long Bridge to No Where with a nice and smooth Cedar Deck :woohoo:
Experience said we probably need 2 days to complete the job :wi:
I hope I'm not the only one who want side railing for that bridge, it's a do or die crossing, since failing will result in a long drop to the bottom of the mountain :gaah:
We need at least 6 people on Saturday to move the big pieces. Sunday should be only the completion of the bridge and a ride to the Tomahawk bridge to look at the damage the ice and the rain did to that bridge and the following slide.
Who is in ?:hb:
Experience said we probably need 2 days to complete the job :wi:
I hope I'm not the only one who want side railing for that bridge, it's a do or die crossing, since failing will result in a long drop to the bottom of the mountain :gaah:
We need at least 6 people on Saturday to move the big pieces. Sunday should be only the completion of the bridge and a ride to the Tomahawk bridge to look at the damage the ice and the rain did to that bridge and the following slide.
Who is in ?:hb: