imported post
imported post
Here is an update on the status of this ride.
So far 4 people have said they are going to do it and there are 9 others who have expressed interest in going if they can get the time. The four who said they are going to go are Farp, Phoenix, The Count, and One Lung. Motorambler definitely wants to go but might have a problem getting time off.
The ride is scheduled for June 9 and 10, (Wed and Thus). I suggest we meet at the Sasquatch Inn on the morning of June 9 and leave at 9:00AM, but that time is subject to change depending on what the group wants to do. If anybody has a problem with that time please let us know.
I have posted a downloadable GPS file of the route on bike.stu.ph. Here is the link to that file:
http://bike.stu.ph/rides/ride.php?ride=204
and here is a photo of the route in Google Earth:
And here is a photo of the same route as shown in Mapquest:
The green spur at the head of Harrison Lake is an optional side trip to Sloquette Hot Springs.
The longest leg between gas stations is from the Sasquatch Inn to Mt Currie - a distance of about 210km. Depending on how far we get the first day we'll be spending the night either in Seton Portage or Lillooet, and that decision will best be made at the end of the day. Harrison Hot Springs will mark the end of the ride. I'll be trucking my bike to the Sasquatch Inn but others might want to choose different routes home.
This promises to be a great ride and all who want to join us are welcome. Please feel free to post any comments or questions. It's just about 2 1/2 months to go - can't wait.
John